NextNews onboarding

Signing you in

Please stay with us while we finish authentication and prepare your Nextspace.

Bengaluru–Mumbai Vande Bharat sleeper train launch date - The Hindu
Open Journal
The Hindu logo
The Hindu
OCT 20, 2026, 11:08 AM
3 min read
25.5KViews
Bengaluru–Mumbai Vande Bharat sleeper train launch date - The Hindu

Account subscription benefits alongside Premium Stories, Editorials, Opinions and more. Unlock these with Subscription

The View From India Looking at World Affairs from the Indian perspective.

First Day First Show News and reviews from the world of cinema and streaming.

Today's Cache Your download of the top 5 technology stories of the day.

Data Point Decoding the headlines with facts, figures, and numbers

Health Matters Ramya Kannan writes to you on getting to good health, and staying there

The Hindu On Books Books of the week, reviews, excerpts, new titles and features.

India's first Vande Bharat sleeper train from Kamakhya Railway Station in Guwahati, Assam to Howrah in West Bengal was launched on January 17, 2026. The train from Bengaluru to Mumbai would be second such service. | Photo Credit: File photo

The Bengaluru–Mumbai Vande Bharat sleeper train is likely to be launched on November 1, coinciding with Karnataka Rajyotsava, with regular operations expected to begin the following day.

The service is proposed to run six days a week, although an official notification from the Railway Board is awaited. Sources in South Western Railway (SWR) said Union Railway Minister Ashwini Vaishnaw is expected to flag off the service.

Once introduced, it will become the first Vande Bharat sleeper train to operate in southern India, providing an overnight rail connection between two major metropolitan cities.

According to a Railway Board communication accessed by The Hindu, the service was approved following the minutes of a meeting held on February 16, 2026. The Bengaluru–Mumbai service will operate as Train No. 27652, while the return journey from Mumbai will be numbered 27651.

As per the proposed timetable, Train No. 27652 will leave KSR Bengaluru at 10 p.m. and reach Dharmavaram at 12.50 a.m. and Wadi at 5.05 a.m. before arriving at Chhatrapati Shivaji Maharaj Terminus (CSMT) in Mumbai at 1.50 p.m. the next day.

In the opposite direction, Train No. 27651 will depart CSMT at 10.30 p.m. and reach Wadi at 7.25 a.m. and Dharmavaram at 11.45 a.m. before terminating at KSR Bengaluru at 2.50 p.m.

The route will connect important railway stations in Karnataka, Andhra Pradesh, and Maharashtra.

Solapur and Pune have been designated for watering and other terminal-related requirements.

The new service is intended to provide a faster and more comfortable option for passengers travelling long distances overnight. Earlier, Mr. Vaishnaw had indicated that the Bengaluru–Mumbai sleeper service would be introduced soon and would mark the debut of the Vande Bharat sleeper variant in southern India.

India's first commercial Vande Bharat sleeper service commenced operations on January 22, 2026, between Kamakhya in Assam and Howrah in West Bengal. Operated by the Northeast Frontier Railway, the train covers approximately 972 km in around 14 hours.

A 16-coach Vande Bharat sleeper rake accommodates 823 passengers. It comprises 11 third AC coaches with 611 berths, four second AC coaches providing 188 berths, and one first AC coach with 24 berths.

The train features fully air-conditioned coaches, automatic sliding doors, CCTV surveillance, bio-vacuum toilets, sensor-operated water taps, individual reading lights, charging points, and digital passenger information display. Catering facilities will offer vegetarian and non-vegetarian meals.

Safety features include the indigenous Kavach automatic train protection system and emergency talk-back facilities. The driver cabins are air-conditioned and equipped with dedicated washrooms.

The final timetable and operational details are expected to be confirmed through the Railway Board's formal notification, according to officials.

Comments have to be in English, and in full sentences. They cannot be abusive or personal. Please abide by our community guidelines for posting your comments.

The Hindu

Original Source

This content was distilled for a focused reading experience. All rights belong to The Hindu.

Read original publication
Bengaluru–Mumbai Vande Bharat sleeper train launch date - The Hindu | Antigravity News